Surface scabbling of tunnel lining to facilitate a future thickening pour. The Ergo rail claiming robot was paired with a bespoke scaffold guide rail system with tube rolled to suit the radii of the tunnel lining.
Join our newsletter
By subscribing you agree to with our Privacy Policy